![]() ![]() ![]() When the necessary approvals are obtained, a LDP will be issued to begin the land disturbance activities. The number of departmental comments and the time it takes for the engineer, land surveyor or other professionals to address the comments determines the time frame in which a LDP is issued. Once the review period is complete, the Development Review Coordinator (DRC) will return comments to the customer for revisions. The preliminary review takes approximately two weeks. Once you submit your epermit application, the associated civil plans are reviewed by technical experts to ensure compliance with development codes and regulations. each Monday will be distributed the following Wednesday at the Development Review meeting. Beginning Februdrop off plans will no longer be accepted and all submittals will need to be made electronically through Accela. Before developing a property in Hall County, plans must be submitted online through our new epermitting platform, Accela (See the link below). The Development Review meeting is held each Wednesday at 9:00am and appointments can be scheduled up to 4:00 pm Tuesday of the same week.ĭepending upon the extent of the project, the plans may include existing conditions, soil and erosion measures, grading plans, septic designs, hydrological plans, roadway profiles, storm drain profiles, landscape plans, fire access, traffic studies, water line profiles, etc. This meeting also provides applicants an opportunity to discuss their project with all departments who will be reviewing their plans. This meeting will give the applicant vital information on the review process, including the number of plans required for review, the timeline, and any associated fees. It is recommend that prior to submitting plans, applicants attend a Development Review meeting. A permit is also needed for all industrial and residential subdivision developments including the preliminary construction phase of roads, ponds, utilities, grading, clearing, etc. A Land Disturbance Permit (LDP) is required for all commercial and industrial activities which involve the construction of new buildings, grading, construction of infrastructure (new roads or utilities), and commercial additions. The Development Review Division assists with the review and permitting of large-scale development projects proposed in Hall County. PLEASE NOTE: Beginning Februdrop off plans will no longer be accepted and all submittals will need to be made electronically through Accela. Development Review Process Lauren Brandaoĭevelopment Review Steps Development Review Coordinator
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |